刘家峡水电站(Liujiaxia Hydropower Station) 位于甘肃省永靖县境内,在兰州市上游l00km的黄河刘家峡峡谷中,是中国自行设计和建设的第1座装机容量100万kW以上的大型水电站,...
基于28个网页-相关网页
In this paper, the technical measures for replacing and Welding stainless steel runner at Liujiaxia hydropower station are introduced.
介绍了刘家峡水电厂不锈钢转轮在现场组焊和更换中的若干技术措施。
The issue of sedimentation in Liujiaxia hydropower station is mainly come from the Tao River that shows serious threat against safety operation of the station.
刘家峡水电站的泥沙问题,主要是由洮河泥沙引起的,严重威胁着电站的安全运行。
The Liujiaxia hydropower station has operated for over 30 years and its releasing structures are seriously damaged due to long term erosion by high velocity silt laden flows.
刘家峡水电站运行已3 0多年,泄水建筑物长期经受高速水流挟带泥沙的磨蚀,破坏严重。
应用推荐