The nine columns 36.58 meter high each are together lifting the parasol onto the sky.
九根36.58米高的柱子共同支撑起巨大的空中雨篷结构。
The key to adopting pumped concrete lifting technology for core concrete of steel pipe concrete columns is to prepare self compacting concrete.
钢管混凝土柱的核心混凝土采用泵送顶升工艺施工的关键是配制自密实混凝土。
应用推荐