... 厂用电系统 auxiliary power system 超前相 leading phase 城市电网 urban distribution network ...
基于1个网页-相关网页
leading phase test 进相试验
leading phase angle 相位超前角
leading phase operation test 进相运行试验
generation leading-phase operation 发电机进相运行试验
Finally puts forward safety attentions should be noticed by operators during generator leading phase operation.
最后提出了运行人员在发电机进相运行中应注意的安全事项。
The analysis indicates that large turbine-generator leading phase operation can improve the reactive power load distribution and the quality of power supply effectively.
试验分析表明,大机组发电机进相运行可有效改善电网无功潮流分布,提高电网供电质量。
Following delivery of the CH147F training suite in early 2014, phase two of the contract will commence with CAE leading the in-service support for the CH147F aircrew training program.
在于2014年初交付CH147 F训练单元以后,合同的第二阶段将从CAE对CH147 F机组人员训练项目的支撑服务开始。
应用推荐