Butyl polymer is used as the insuation and coloring for the installing and laying work.
绝缘线芯分色,为敷设安装提供方便。
At every important link, there presented technical requirements and relevant measures, so as to make the laying work to be carried out successfully.
在各个环节,提出相应的技术要求和措施,保证了沉管敷设工的顺利进行。
Laying work is completed, due to the natural adhesive was still drying process, so wet cleaning work must be thoroughly dried after the adhesive (approximately 48 hours) before proceeding.
铺设工作完成后,由于胶粘剂尚在自然干燥过程中,因此潮湿的清洁工作必须在胶粘剂彻底干透以后(约48小时)方可进行。
应用推荐