Large scale blast furnace is the developing trend of the ironmaking. Constructing huge blast furnace must have fine burden and high grade coke.
高炉大型化是发展趋势,但大型高炉对炉料要求严格,建设巨型高炉必须有好的炉料及高质量焦炭。
The lining structure with concentrated copper cooling plate-stave combined system for the large-scale blast furnace is the important guarantee of 18 ~ 20 campaign life.
大型高炉的密集式铜冷却板与冷却壁结合的炉衬结构是使高炉寿命达到18 ~ 20年的一项重要保证措施。
In order to adapt the need of loading and unloading drill rod of iron gate-opening machine for large-scale blast furnace, the new change rock drill machine is designed.
为适应大型高炉开铁口机的装卸钎杆需要,设计开发了新型换钎机。
应用推荐