The landing is threadconnectedwithstopringand tightened onandputintodownhole with drillstring. The landing sub is used asasubabove drill string before checkvalveis runin downhole.
These, in turn, connect to 132KV export cables carrying the electricity to a beach landing point at Pensarn for onward transmission to the new electricity sub station at St Asaph.