land-forming 成陆
Land preparation for basin irrigation is accomplished by forming a narrow ridge between 15 and 50 cm high on all sides of each area to be flooded.
格田淹灌的田间准备是在每一个灌溉田块周围形成15—50厘米高的窄田埂。
Slope-bottom land transition zone was usually neglected in previous exploration but was favorite site of forming lithologic reservoir.
坡洼过渡地区是已往勘探常被忽略的构造带,但却是岩性油藏形成的有利场所。
The owner of this case constructs his dwelling place bit by bit on his own land, forming a series of indoor and outdoor small space which could provide him better appreciation of his land.
本案的业主在他的土地上一点一点地建造居所,并形成了能够让他更好地欣赏他自己土地的一系列室内和室外的小空间。
应用推荐