The junction of bonding jumper should be clean and covered with conductive paste. And the tightening moment for bolt must fit with equipment wiring requirements.
接线搭接面确保清洁,涂抹导电膏,螺栓紧固力矩符合设备接线要求说明。
For the Chenjiachong tunnel rebuilding project, the junction and seepage of the fresh and old concrete are tested by using the ground penetrating radar and microwave humidity equipment.
结合既有陈家冲隧道改建工程,采用探地雷达和微波湿度测定仪检测了新旧混凝土接缝处结合状态和渗漏情况。
应用推荐