The author analyses some problems in pool design, such as the determine of groundwater level, the setting of shrinkage joint, practice of later casting zone and the fitting of design and construction.
通过作者多年在水池设计中所遇到一些常见问题,从结构专业的角度出发,分析探讨了地下水位的确定、伸缩缝的设置、后浇带的做法及设计与施工配合等问题。
In practice, when firms try and have these agreements, which are not contracts, to try and produce joint monopoly output, what else goes wrong?
现实中,公司想要达成这样的协议,而非合同,想要维持垄断产量,还会遇到什么问题呢
应用推荐