Vertical and annular reinforcing steel bar stress and pipe-soil contact pressure during pipe jacking were monitored on the spot.
对顶进过程中管道纵向与环向钢筋应力及管土接触压力进行了现场测试。
The jacking force has apparent effects on displacement and stress distribution of segments, and it is the most adverse load case during construction stage.
千斤顶顶力对施工阶段管片的位移、应力有明显的影响,千斤顶顶力作用是管片在施工状态下最不利的工况。
应用推荐