The organization shall establish and maintain procedure for controlling nonconformance products, include identification, tracing, isolation and disposal.
The result of this example indicate that if the framesystem is adopted, the flexibledisposalof isolatedbuilding , the isolationeffectivenessandthe lowercostcan beachieved.