TORQUE also requires that all node names be resolved to an IP address, so use the IPMIs of the nodes as dummy execution nodes, as shown in Listing 27.
TORQUE还要求所有节点名均被解析成一个IP地址,所以可以使用这些节点的IPMI作为伪执行节点,如清单27所示。
The frame model of Integrated project Management Information System (IPMIS) is established and the empirical study of its application in urban rail transit projects is carried out.
分析进行信息集成管理的必要性,建立集成化项目管理信息系统(IPMIS)的框架模型,并对该系统在新交通工程中的应用进行实证研究。
应用推荐