Uncontrolled introduction of changes to the production environment can harm the system.
在生产环境中不加控制地引入修改会破坏系统。
Act as the interface between ChangAnFord(CAF) and the Engineering Source(s) on ECC and WERS concern process, to ensure smooth progression and introduction of changes.
作为长安福特和产品 工程源头的联络窗口,在 工程更改控制和WERS问题处理 过程中确保 工程更改的顺利导入和进行。
There is a powerful movement within the people that can see the urgent need for a new approach to life, and is pressing for the introduction of changes that will allow it to happen.
人们之中正进行着强有力的运动,可以看到人们迫切要求新的生活方式,并强烈要求引进改变,以使新的生活方式得以到来。
应用推荐