Responsible for unit, module, integration and system testing including preparation of test cases, execution of test plan, verification and reporting of test results.
负责单元、模块、综合系统的测试,包括:开始程序的测试、执行计划的测试、运行结果的更正和报告。
The team still had to undertake integration and testing at the system level.
团队仍然必须在系统级别上承担集成和测试的任务。
Test engineers can use it to catch memory errors during functional verification and system integration testing.
测试工程师可以利用它获取功能验证和系统整合测试期间的存储错误。
应用推荐