... installation manager 安装经理 installation period 安装周期 installation personnel 安装人员 ...
基于98个网页-相关网页
installation period and measures 安装关键工期及综合措施
It also includes the sustainment and the maintenance of the installation for a period of 18 years, with guaranteed levels of operational availability of 98% for the radar and its infrastructure.
合同还包括了该雷达18年使用周期内的支持和维护,确保该雷达与有关基础设施在使用周期内至少拥有98%的作战能力。
It can be produced by factory scale with quickly installation and short construction period, which is suitable for constructing temporary structure.
可工厂规模化生产,安装迅速快捷周期短,适用于搭建临时性建筑。
Total work period of main installation of project shall be 100 days which be calculated on and from the date at which contractor access practically to project site.
本合同工程安装的主体总工期为100天,以施工单位实际进场之日起开始计算。
应用推荐