The actual signal distortion levels depend upon input and output signal amplitude, as well as the output load impedance.
实际的信号失真水平取决于输入和输出信号的幅度,以及输出负载阻抗。
In the paper, a BP network in which the factors to effect groundwater levels are set as input neurons and the groundwater level is set as output neuron, was established to forecast groundwater level.
本文把影响地下水位的因素集作为网络的输入向量,地下水位本身作为网络的输出向量,构成了预测地下水位的BP网络模型。
Digital input and output levels are TTL.
数字输入和输出水平的TTL。
应用推荐