好在我们这次SSB之行不是银行检查(bank examination),而是基础评估(infrastructure review),没有打分这一说,所以,气氛要缓和许多。
基于1个网页-相关网页
The fifth activity in this phase, Specifying the review of the test object and infrastructure, can be mapped to RUP's Validate Build Stability.
在此阶段中的第五个活动,说明测试对象和基础结构的复审,可以被映射到RUP的确认构建稳定性中。
to review and verity key projects of city infrastructure, environment protection facilities and land and property development;
审核重大城市基础设施、城市环保设施、房地产开发项目;
Besides, the SGA infrastructure should be set-up that covered SGA committees (chaired by production manager), rewards and recognition, SGA review and SGA presentations.
此外,小组活动(SGA)的基本设施应该包括SGA委员会(由生产经理领导),金钱与非金钱的奖励,SGA的回顾与展示。
应用推荐