Most projects, including designing or revising Web sites, have to deal with constraints of time, budget, and resources.
大多数项目,包括设计或修改网站,都要处理时间、预算和资源等方面的限制。
Agree with the team the objectives for the iteration, including evaluation criteria, timescales, and constraints.
对迭代的目标,包括评估标准、时间表和限制,与团队达成协议。
Changing the database in other ways, including adding, dropping, or modifying indexes or other constraints.
以其他方式修改数据库,包括添加、删除或修改索引或其他约束。
应用推荐