Incineration plants should be built to burn household waste.
应该建焚化厂来焚烧生活垃圾。
Commonly used construction modes of waste incineration plants at present were introduced, including parallel contract, design-construct lump-sum contract, and design-construct combo contract.
结合实际工程情况从工程的背景与定位、规划与布局、核心建筑概述、消防设计、建筑设计特点等几个方面对垃圾焚烧厂建筑设计要点作简明的阐述。
应用推荐