This paper studies the application of FHW in high-tech project evaluation, including building the index set and evaluation matrix of FHW. Satisfactory results are obtained froth an example.
本文探讨FHW法在高新技术项目评价中的应用,包括指标的确定,FHW评价矩阵的建立,所得结果是令人满意的。
In this essay, practical procedure and method of electric power project evaluation were put forward on the basis of theory and method analysis.
但在以往的电力项目后评价研究中,往往只重视评价方法的研究,而对评价方法的可操作性和操作的程序却没有给予足够的重视。
Taking into account vagueness and randomness of project, fuzzy and probabilistic method for project risk evaluation is presented in this paper.
考虑到工程项目建设的模糊性和随机性,本文提出一种用于工程项目风险评估的模糊概率分析方法。
应用推荐