The side slope at the exits of the diversion tunnels of Geheyan hydropower station is a man-made high and steep one.
清江隔河岩水利枢纽电站引水洞出口是由自然边坡改造而成的高陡人工边坡,具上硬下软岩体结构。
In tailrace tunnels of large hydropower station, a transient mixed free-surface-pressure flow may occur, which has a complex effect on the stability and transient of the power plant.
大型水电工程的尾水隧洞中可能会发生明满交替流动,给电站过渡过程带来很大影响,需要建立合理可行的明满交替流动数值计算模型。
应用推荐