Using this model the optimum compensating dispatching in the cooperation of Three Gorges hydropower station with the hydropower station group within the Three Gorges power system is studied.
并应用该模型对三峡电力系统水电站群与三峡电站联合运行进行了优化补偿调度研究。
The optimization model and application of long-term operation of reservoir group of hydropower station were established in according to the system engineering and the linear programming methods.
水电站水库群长期运行优化模型及其应用,是根据系统工程的思想,应用线性规划的方法建立起来的。
An optimal operation model for group function of hydropower station is set up based on the basic principle of decomposition-coordination for big system.
本文根据大系统分解协调方法的基本原理,建立了水电站群优化调度模型。
应用推荐