This paper presents a design example of using a cable crane for lifting and erecting an access bridge for the right bank spillway tunnel for the Lubuge Hydropower Station.
这里介绍了应用于鲁布革右岸泄洪洞交通桥吊装的缆索起重机的设计实例。
The results of the example behind the paper showed that the methods have higher value of reference and application for middle small sized hydropower station.
结果表明,本文方法及分析思路对中小型水电站年负荷率的预测具有较好的应用和参考价值。
应用推荐