Mine hydrogeological condition 井田水文地质情况
hydrogeological condition changes 水文地质条件变化
mining hydrogeological condition 水文地质开采条件
The hydrogeological condition and the original scheme on pumping are analyzed, and some new drainage methods are pointed out.
本文分析场地地下水现状,剖析降水设计方案,提出有针对性的降水新构想。
Abstract: : the karst is strongly developed in Dazhiping tunnel, where the hydrogeological condition and geological structure is complex, so the construction is difficult.
摘要:大支坪隧道岩溶发育强烈,水文地质条件和地质构造复杂,施工难度大。
Formation of the oxidized Mn deposit is controled by the primary Mn ore layer, tectonics, geomorphology, thickness and lithology of the cover rock, climate and hydrogeological condition.
认为表生富集型氧化锰矿床的形成主要受原生含锰层、地质构造、地形地貌、顶盖层厚度、岩性、气候及水文地质等条件所制约。
应用推荐