A hydroelectric scheme to provide power to rural areas.
为农村地区提供电力的水电方案。
The environment impact synthetic assessment and construction scheme optimum selection problem of hydroelectric plant on the basis of catastrophe theory is approached.
基于突变理论,对水电站环境影响综合评价及建设方案优选问题进行了探讨。
The standard of river diversion during construction is one of important problems involving safe and economic design scheme of hydroelectric project.
施工导流标准的确定,就其本质而言是风险决策问题。
应用推荐