After cleaning, the resistor should be dried in a low humidity atmosphere for several hours to allow any static charges to dissipate.
清洗之后,应当使电阻器在低湿度的空气中干燥几个小时,以便使静电消散。
The first coat of paint must be applied maximum3 hours after the preparation of the surface if the relative humidity of the air is between50% and80%.
如果空气的相对湿度介于50%-80%,底层油漆必须在表面处理后最多3小时内涂覆。
Development complete in 48 hours after coating film, if there is ample humidity in workshop, it must be finished within 12 hours.
涂覆后需在48小时内显影,若操作场所温湿度较大,需在12小时内完成作业。
应用推荐