The turbine DEH system adapts to prompt load drop, when the unit runs with transient house load to realize sliding pressure shutdown following the time required by turbine main equipment.
在汽机DEH系统适应快速降负荷的情况后,根据汽机主设备要求的时间短暂带厂用电负荷运行进行滑压停机。
House load operation of gas turbine is described as an operation with station-service power under the condition of disconnection to main power grid, which can make a power plant operate safely.
燃气轮机的小岛运行是指燃气轮机在与主电网解列的情况下,带厂用电运行,从而保证了电厂的安全运行。
We would gather early in the morning at his house, load up in three or four cars, and take off for the foothills outside of Tehran.
我们一大早就聚集在他家里,塞进三四辆车,然后朝德黑兰市郊的山脚下进发。