The cold rolled coils entered into hot DIP galvanizing workshop are put on waiting position and then transferred to uncoiler by coil car.
冷轧卷进入热镀锌车间后置于待处理位置,然后通过上卷小车送至开卷机。
Lead and organize the operators to conduct the TPM and CIT action within the hot forming workshop.
积极领导并组织本车间员工进行持续改善及设备的自主维护;
The plan design of smoke dust collecting system in hot strip finishing rolling in Hot Strip Workshop of No.
介绍了宣钢第一轧钢厂热带车间热带精轧过程中烟气除尘系统的方案设计。
应用推荐