Iida said Fukushima Daiichi's reactors remain too hot to pour concrete, but he suggested pouring a slurry of minerals and sand over them to carry away heat before encasing them.
Each of the 65-foot-tall, 640-ton generators -- built by Japan's Mitsubishi Heavy Industries -- are packed with thousands of narrow tubes that carry hot, pressurized water from the reactors.