The requirements of control in the national great science engineering HIRFL-CSR are fulfilled.
满足了国家重大科学工程HIRFL - CSR系统的控制要求。
It is important for HIRFL to improve the whole operation level if SSC accelerating voltage can be increased.
SSC加速电压的提高对于HIRFL整体运行水平的提高具有重要的意义。
According to the longitudinal matching requirement of the HIRFL two cyclotrons, a scheme of the new B1 buncher has been introduced.
根据HIRFL加速器的束流纵向匹配要求及实际情况,给出了新B1聚束器腔体的具体设计方案。
应用推荐