heavy-load combined train 重载组合列车
The control order was given to slave control locomotive from the master control locomotive by serial communication, therefore the synchronization brake is realized and the safety of the heavy-load train is ensured when it is running in tunnel.
通过采用RS485串口通讯的方式,将主控机车的控制命令发送给被控机车,因而可以达到制动的同步性,从而保证了隧道区段重载列车行使的安全性。
参考来源 - 重载列车空气制动系统分析与纵向动力学的研究·2,447,543篇论文数据,部分数据来源于NoteExpress
应用推荐