In the oil combustion, using top gun, the upper wind at a heat load of boiler blower gathered, part of the furnace temperature is high, reaching the ash melting point, resulting in boiler coking.
在投油稳燃时,运用上层油枪,使得上层一次风处热负荷会集,锅炉鼓风机部分炉温高,到达灰熔点,致使锅炉结焦。
Improvement of PLC control system on new steam soot-blower in heat pipe preheater is introduced.
介绍了可编程控制器在新型蒸汽巡扫吹灰装置中的应用与改进。
Application of PLC C200H on new steam soot-blower in heat pipe pre-heater is introduced.
介绍了可编程控制器c 200h在热管空气预热器新型蒸汽巡扫吹灰系统中的应用情况。
应用推荐