The first wind farm, with five floating turbines, will be completed by 2017 and a larger 500 megawatt farm (half the strength of a nuclear power plant) by 2020.
By the end, Clinton was operating at half-strength: In most states, Obama had double or triple the field offices she had and often four to five times the ad budget.