在接地资料中提出用两条接地导线重复连接的方法,以便测量接地连接(Grounding path)电阻,而不是测量接入大地(Earthing)的电阻。这与欧共体国家的规定是一致的。
基于12个网页-相关网页
For bow hard grounding, damage path will go toward the side of ship hull, and the contact between the ship and the rock will change gradually from intense impact to lateral press and slip friction.
对于船艏高能搁浅的情况,损伤路径会向船体外侧偏离,船舶与礁石之间的接触由剧烈的冲击逐渐过度到侧向挤压和滑动摩擦;
The laying path, basic structure, layout mode, the intermediate joint structure and grounding mode of the cable were also described.
介绍了电缆敷设路径、电缆的基本结构、布置方式、电缆中间接头的结构、电缆接地方式。
See Section 21. 9.2 revised June 11, 2008 9.3 An identified grounding contact, or grounding-conductor path through a device shall be of plated or unplated copper or copper-based alloy. Exception No.
第9.2节于2008年6月11日修订9.3 一个通过一器件的确定的接地接触件或接地导线通路应该用电镀的或不电镀的铜或铜合金制成。
应用推荐