You should see a green status indicating that is has started.
您应该看到绿色状态,指示它已经启动。
When all the roles are successfully configured and at green status, the virtual application is ready to be accessed.
当成功配置好所有角色并且状态处于绿色时,就可以访问虚拟应用程序了。
StatoilHydro calls Sleipner "the mother of all CCS projects" but its green status came partly out of necessity as gas found there naturally has a higher CO2 content than clients wanted.
StatoilHydro公司将斯莱普尼肯尔称作“一切CCS工程之母”但它的绿色程度很大程度上是超过了实际需求的,因为在那里采出的天然气本身拥有超出客户需求的二氧化碳含量。
应用推荐