This paper introduce the calculational program of coping elevation for free plate girder curve bridge and resolve the handworked calculational defect, it will useful for improving work efficiency.
文章通过对曲线简支板桥盖梁标高计算程序的介绍,解决了手工计算的缺点,对于提高工作效率起到了一定的作用。
The text detailedly introduced crown block, running system, availability work period of bridge girder erection equipment and improve case for precast beams install.
详细介绍了对双导梁式架桥机天车、行走系统、有效工作长度及预制梁安装就位的改进情况。
As a new installation method for big structures, double girder integral lift is mainly composed of fixed girder, moveable girder, work anchor, moveable anchor, jacks and guide rail.
双梁式整体提升法是一种新型的大型结构安装方法,主要由固定梁、活动梁、钢绞线、工作锚、工具锚、导向装置及千斤顶组成,与现在常用的安装方法相比,具有价廉、安全、高效和易推广等特点。