It applies to general fluid media and process conditions of production process control system.
它适用于一般流体介质和工艺条件生产过程控制系统。
Its production method and general gabion material structure, but the gap between the process of stone filling in stone are concrete filled.
它的生产方法和一般的格宾石笼结构一样,只不过是在填充块石的过程中块石之间的空隙都被混凝土填充。
Adoption of the CRCC process improves the general property of strips and reduces the production cost.
通过控轧控冷工艺提高了带钢综合性能,节约了生产成本。
应用推荐