crown-fullness ratio 树冠圆满度
The results indicated that the maximum discharge capacity, the terminal velocity and the largest permissible fullness ratio of110mm plastic stack were 6.255L/s, 4.201m/s,and 0.18 respectively when there was only stack vent.
试验结果表明:①仅设伸顶通气管条件下,φ110塑料排水立管最大通水能力为6.255L/s,立管终限流速为4.201m/s,其最大允许充水率α为0.18。
参考来源 - UPVC塑料排水立管最大允许充水率α值的试验研究·2,447,543篇论文数据,部分数据来源于NoteExpress
应用推荐