With luck, you can recreate the fault in the unit test and diagnose it without having to load the full, complicated environment.
幸运的话,可以在单元测试中重新生成错误并进行诊断,而不需要加载完整的复杂环境。
Each performance test consisted of a ramp-up period, followed by a period with a full user load.
每一个性能测试都由一个过渡时期组成,接着一个全用户负荷时间。
The test program will operate the permanent magnet propulsion motor up to full power (full torque and full load) in a test facility that simulates an actual U.S.Navy DDG-1000 engine room.
测试程序将在一个美海军仿真实际DDG - 1000引擎室的测试设施中操作永磁推进马达至全功率(全扭矩和全负载)。
应用推荐