Further, the paper discussed the necessity of using full concrete lining for the Xiaowan plunge pool and made new proposals for its bottom elevation, length and shape.
文中还讨论了小湾水垫塘采用全面混凝土衬砌的必要性,并对水垫塘底板高程、长度及体型提出了新建议。
Calculating and measuring the full bin capacity, time of each bin, mixing delay capacity, feed time difference, and mixing length, etc. , are investigated in this paper.
本文计算并测定了FA022型多仓混棉机的各仓一次充满容量和一次充满时间、混和时延容量、时间差及混和长度等;
应用推荐