The function of real time control, state monitor, data storage, fault alarm, system management was realized in the course of fuel circulation.
实现了燃料元件装卸循环过程的实时控制、状态监控、数据存储、故障诊断和报警、系统管理等功能。
Steady and efficient feeding of fuel and lime stone is one of the basic prerequisites of normal operation of a PFBC combined circulation power plant.
向加压流化床(PF B)锅炉稳定、高效地供给燃料和石灰石是PFBC联合循环电站正常运行的基本保证。
The result shows that if the cooling system of the spent fuel storage pool can be retrieved in 19 hours, the natural circulation cooling ability is sufficient to prevent radioactivity release.
计算结果表明。恰希玛核电厂乏燃料池冷却系统失效后, 只要在19 个小时内修复冷却系统, 不会出现大量放射性物质外泄。
应用推荐