In the prestress design of PC continuous rigid frame bridge, there are two problems in dire need of solving.
在预应力混凝土连续刚构桥预应力设计中,有两个问题急需要解决。
Push thrust construction, problem and treatment measures of frame bridge with big skew angle in soft ground are described in this paper.
叙述了在软土地区进行大角度斜交箱形地道桥的顶进施工及遇到的问题和处理措施。
This continuous rigid-frame bridge construction of complex structure, and environmental factors, increases the difficulty of construction.
该连续刚构桥构造复杂,且受施工环境因素制约,增加了该桥施工难度。
应用推荐