It is placed in the formation via a fracture, frac-pack, gravel-pack, or pre - packed screen system.
它通过裂缝或预填充筛管系统放置在地层中。
After the zonal isolation packers were simultaneously set and tested, the TORRENT service tool was positioned at the lowermost zone to perform the frac-pack stimulation.
在层间隔离封隔器坐封并测试后,操作人员将TORRENT充填的服务工具定位在最下层的位置上来对此层进行挤压充填作业。
Frac and pack technology is both a effective stimulation and sand control treatment, and a new completion method in unstable crumbly formation and high permeability reservoir.
压裂充填工艺是中高渗透油气层和不稳定松软地层的有效增产、防砂措施,又是一种新的完井方法。
应用推荐