Research on coal bedding structure is the theory foundation and precondition of coal seam gas exploitation.
煤体层理结构的研究是煤层气开发开采的理论基础和前提条件。
A bedding fault zone in layer C5 and a fractured fault zone which determine the stability against sliding and bearing capacity of the dam exist in the dam foundation of Tongjiezi project.
铜街子水电站大坝基础存在有控制大坝抗滑稳定和承载力的C_5层间错动带和断层破碎带。
Following the required loading conditions of the foundation, a sand bedding course was used for its groundsill.
根据建筑荷载以及实际情况进行方案比选,采用了砂垫层换填法处理地基。
应用推荐