First, we put forward the system scheme of the management of the power Losses of line and discuss the feature of this system scheme. It use tri- tier structure with combination of B/S and C/S.
首先,我们提出了配网线损管理系统的系统方案,系统方案采用了C/S和B/S相结合的三层系统结构,随后我们详细阐述了三层系统结构的技术特点和实现方式。
The power DT1, DT2 power, C port A, D port and exhaust ventilation, compressed air to push the piston rod oil cylinder forward, realize the preloading force state in figure 2;
DT1通电,DT2断电,C气口通气A、D气口排气、压缩空气将油压到油缸内推动活塞杆前移,实现预压出力状态如下图2;
应用推荐