inflatable formation packer 膨胀式裸眼封隔器
A retrievable or drillable packer is set above the formation to be cemented.
在要被注水泥的地层的上面坐封一个可收回封隔器或可钻封隔器。
A cement squeeze process during which a packer is set in the well and the slurry is pumped down the tubing and into the formation.
在井内坐封一个封隔器,然后沿油管向下注入水泥浆并使它进入地层的挤水泥过程。
Formation center tester (FCT) is made up of hydraulic power joint, double PACKER joint, opposing infuse joint, numeric pump exhausting joint, sensor joint and sampling tube joint.
钻井油气层测试器是由液压动力短节、双packer短节、反向注入短节、数字泵抽短节、传感器短节和取样筒短节组成的。
应用推荐