When fill earth subgrade exercise part by part. The former part's gradient should be less than 1:5. Slope surface must be flat, so that, the construction machine can move from top to bottom.
填土路基分段作业时,先施工路段端部必须留不陡于1:5的坡面,坡面必须整平压实,以便施工机械上下及下段路基施工时开台阶。
Taking macroarea filled soil on alluvial flat after compaction as subgrade for building is very few.
在这样的场地上,大面积新填土,碾压后修建建筑物,还是很少见的。
应用推荐