AS the first stamping process(drawing) reflects the idea of a whole procedure, a proper route aided by CAE evaluation of a drawing die has been discussed in detail in this paper too.
考虑到装配、制件表面质量、加工成本等因素,重点论述了如何借助CAE平台实现对冲压工艺方案的可行性评估,从而在多个成形工艺方案中选择一条优化的工艺路线。
This paper proposes that: the deformation in stamping design prefabricated hole forming specific height fittings first tee is feasible, but needs to process parameter optimization.
本文主要研究以冲压变形规律设计的预制孔管件一次成形特定高度的三通管是可行的,但需对工艺参数优化。
应用推荐