·2,447,543篇论文数据,部分数据来源于NoteExpress
Because the first caving of work face haven't been finished, the tunnel roof and hole can not be used and gas often goes beyond the limit, so some measures must be taken.
由于工作面初次放顶没有完成,顶板巷道、顶板钻孔等不能发挥作用,常发生瓦斯超限现象,必须采取针对性措施。
youdao
应用推荐
模块上移
模块下移
不移动