So, you start with an expression and provide one or two options (true or false paths).
如是,您以表达式开头,并提供一或两个选项(真或伪路径)。
Without false paths, the errors of evaluation delay and precharge delay are within 3.62% and 8.26% respectively.
如果不考虑伪路径的影响,求值方向和预充方向延时的最大误差分别为3.62%和8.26%。
Firstly, false paths in static timing analysis and the algorithm to sensitize paths are presented, and then some factors affecting gates and interconnects delay are discussed.
首先,文章讨论了静态时序分析中的伪路径问题以及路径敏化算法,分析了影响逻辑门和互连线延时的因素。
应用推荐